2028 – 2033 key developments​

Domestic jet terminal operational

Offering a significant uplift in travel experience, the new domestic jet terminal will comprise 12 jet gates adding more gate capacity.

Existing domestic terminal building

With the shift of widebody jets to the new integrated terminal, and with the current domestic terminal building becoming a dedicated regional terminal, aircraft stands will be reconfigured from Code C to turboprop planes.

New regional pier A3

Pier A3 will cater for both jet and turboprop operations serving mostly regional destinations.

Pūkaki Bridge

Increased road capacity across Pūkaki Bridge to relieve congestion for people travelling to and from the east.